Managing Tenants Through Construction
Full lesson transcript
The tenants beside a construction job are not bystanders. They are the customers paying for the building it is happening in. On an actual job, it gets forgotten constantly. The owner's attention goes to the space being built. That is where the money is going out.
The tenants next door are where the money is coming in. For the length of the job, they are living with the noise and the dust. They deal with the dumpster in their parking lot and the crew in their hallway, with nothing to show for it. Begin with what the lease says. Most commercial leases give the landlord a right of entry, the right to enter the premises and do work.
Most also contain a promise of quiet enjoyment. meaning the tenant's right to use its space without substantial interference. Those two ideas sit in tension. The landlord may do work. The tenant may use its space.
Construction lives in the gap between them. A landlord who interferes badly enough without notice can face claims for rent reduction, sometimes called abatement. The practical question is how to keep the tenants whole while the work goes on. Before anything disruptive happens, the affected tenants hear about it from the owner's side, not from the noise. Here is the notice to tenants before disruptive work.
Three parts, word for word. Here is what you will notice. Here is when it happens, and here is who to call if it is worse than that. What you will notice means what they will hear, smell, lose, or have to walk around. Odors from adhesives, blocked entrances, lost parking, and above all, shutdowns of water, power, heat, cooling, or the fire alarm.
The tenant does not care what the contractor is actually doing. Some work in an occupied building is going to be disruptive no matter what. The rule is simple. Utility shutdowns happen outside the affected tenant's business hours. That requires notice at least a few days ahead, usually early morning, evening, or a weekend.
That schedule costs more. Crews are paid more to be there. That premium is not a penalty. It is part of the basic cost of working in an occupied building. Loud work can often be sequenced the exact same way.
Tenants need one person to call, not the contractor or whichever worker is nearest, usually the property manager. That person hears the complaint, decides whether it is real, and takes it to the superintendent. There are smaller courtesies that add up. A clean construction barrier instead of plastic sheeting. Walk-off mats where the crew passes through a shared corridor.
Filters and floor protection so dust stays inside the work area. Crews that park in the far corner of the lot. Much of this can be settled before the job starts. Experienced owners write the rules of the site into the construction contract itself. Permitted hours for loud work and where they park.
When those rules are in the contract, they are part of the price. When they are raised halfway through the job, they are a change order. The tenants deserve the good news as well as the bad. Most construction in an occupied building is meant to make it better. Tell the tenants what the work is for and roughly when it ends.
People tolerate a great deal of noise when they know what it is building and when it will stop. A tenant who notices that the owner thought about these things gives the owner the benefit of the doubt when something goes wrong. Now, the named mistake in an occupied building, the surprise shutdown. An illustrative example. A plumbing contractor needs to tie a new line into the building's main.
The superintendent schedules it for a weekday morning because the plumber is available. Nobody tells the dental office two doors down. At nine in the morning, with a full waiting room, the water goes off. They cancel the morning. The dental practice sends the landlord a letter.
It asks for a month's rent abatement, roughly six thousand dollars illustrative for the lost day. The landlord wanting to keep the relationship and agrees to a partial credit of three thousand dollars. That credit is not the real cost. The real cost comes two years later. The practice's lease expires and they move across the road.
The landlord faces months of vacancy, a new build-out, and a leasing commission, easily fifty thousand dollars or more. Illustrative, the tenant remembered it. A notice, a call, and a shutdown scheduled for six in the evening would have cost a few hundred dollars in overtime. Watch for the first complaint. How quickly it is answered decides how the rest of the job goes.
A tenant whose first call is returned the same day tends to units. A tenant whose first call disappears tends to start calling everyone. The construction is temporary. What a tenant remembers about how you handled it is not.