Prepayment, Defeasance, and Getting Out Early

Underwrite · Lesson 3.8 · 5 minutes · Captions on by default, press CC to turn them off

Full lesson transcript

Earlier, you learned that a conduit loan cannot be renegotiated because the lender who made it no longer owns it. And here is what that means on the day you want to leave. Commercial loans are priced on an assumption. The lender or the investors behind it expects to receive a certain stream of interest for a certain number of years. If you pay the loan off early, that stream stops.

So most fixed-rate commercial loans include a prepayment clause, the part of the loan agreement that says what you owe if you repay before maturity. It can cost almost nothing, it can cost hundreds of thousands of dollars, and it is decided the day you sign, not the day you leave. Exiting a fixed-rate loan is rarely a negotiation. It is a calculated mathematical consequence of breaking a timeline. There are four common versions.

Each one belongs to a different kind of lender, and each behaves differently. The first is the step-down, a prepayment penalty that is a fixed percentage of the loan balance and falls each year. Local banks often use it. On a two-million-dollar loan, illustrative, five percent in year one drops to four in year two, three, two, one, and nothing after that. Leaving in year three costs roughly sixty thousand dollars.

The second is yield maintenance, a payment that makes the lender whole for the interest it will no longer receive. Life companies and agency lenders often use it. The idea is that if you leave, the lender reinvests your money in government bonds. If those bonds pay less than your loan did, you pay the difference for every remaining year in one lump sum. The third is defeasance, replacing the building as collateral with a portfolio of government bonds that produces the same payments the loan would have.

Conduit loans usually use it. The loan is not actually paid off. It stays in the trust, and your building is released, and you are free to sell or refinance. You pay for the bonds and for a team of specialists to set it up. Floating-rate loans work differently.

Because the lender's return rises and falls with the market anyway, there is less future income to protect. Many floating-rate loans allow repayment with little or no penalty after a short initial period. The fourth is the lockout, a period, often at the start of a loan, during which you cannot prepay at all. These structural mechanisms exist to shift the financial risk of a broken timeline from the lender's ledger entirely onto the borrower's shoulders. Here is the part of prepayment that most borrowers find hardest to believe.

On yield maintenance and defeasance, falling rates make leaving more expensive, not less. Think about it from the lender's side. If rates have dropped, the lender can only reinvest your money at a lower return, so the gap you have to fill is wider. Now, the mistake. Planning to refinance when rates fall on a loan built to prevent it.

Illustrative. A borrower takes a ten-year, three-million-dollar fixed-rate loan with yield maintenance and plans to refinance if rates drop. Rates do drop by around a point and a half in the third year. The borrower calls a mortgage broker for a payoff quote. The prepayment penalty alone comes back at roughly a quarter of a million dollars, roughly the value of the interest savings the new loan would have produced.

The exact same thing happens with a sale. An owner gets an offer on a building midway through a loan term and assumes the loan will simply be paid off at closing. Then the defeasance cost arrives, large enough to change whether the sale is worth doing at all. There is one other door out: assumption. A buyer takes over your existing loan with the lender's approval instead of paying it off.

If rates have risen since the loan was made, an assumable loan bypasses the penalty and can make your building attractive to a buyer. An interest rate drop does not set a borrower free. It raises the penalty and locks them into their original higher rate. Here is the practical rule for prepayment terms. Match prepayment to the hold.

A true long hold can accept yield maintenance. If you might sell, refinance, or recapitalise within a few years, paying a slightly higher interest rate upfront for a step-down or a floating-rate loan is usually worth the cost. There is no free version. Before you sign any fixed-rate commercial loan, ask the lender to put the exit in dollars, not in formulas. Here are the exact words.

"If I sold this building in year four, what would it cost me to pay off this loan in dollars?" A lender can model that under a few rate scenarios. The answer turns an abstract legal clause into a real number you can weigh against the interest rate. Your real estate attorney should read the prepayment clause as well because the details differ from loan to loan. Watch for the open window and its exact dates. It is a brief period near the end of the term, often the last few months, when you can repay with no penalty at all.

Ask for the date in writing. Every loan has a door. Find out what it costs to open before you walk in. You now know how to read the price, the terms, and the exit doors of a commercial mortgage before you are trapped inside one. Next, we open the capital stack to see how equity and debt combine to fund a building.